Marquis Project, Palm Beach Gardens, FL
Boat:
2006 65’ Marquis
Location:
Hemingways Boat Yard Dash Palm Beach Gardens Florida
Project Duration:
2.5 Weeks
In an impressive undertaking, Triton Liners successfully rebuilt two 600-gallon diesel fuel tanks while the vessel remained in the water. These saddle tanks, positioned outboard of the engines, presented a significant challenge for replacement due to their location. However, through our expertise and meticulous approach, we addressed the internal corrosion issues that had caused the tanks to fail, as evident from the accompanying photos. It serves as a reminder of the importance of thorough tank cleaning. Our ability to accomplish this task without removing the vessel from the water demonstrates our commitment to providing innovative solutions and minimizing disruptions to our clients. Trust us to handle your tank maintenance needs with utmost care and professionalism.