Carver 440 Aft Cabin Project – Lindenhurst NY
1995 Carver 440 Aft Cabin
Rutherig Marina, Lindenhurst NY
Triton Liners rebuilt two 240-gallon diesel fuel tanks on site.
As you can see by the photos we had to deal with a storm surge which made things a little interesting.
We had to make sure we were on the boat with everything we needed at low tide and were basically on the boat all day until the tide went back out far enough so we could get off.